Categories

Contact Us

2fprototypes Co.,Ltd
Add:No.21 Building, 98 Industrial District, Shajing Town, Baoan, Shenzhen, China
Tel:+86-755-23078283
Ph:+8618929368892
E-mail:info@2fprototypes.com

Brake Parts Rapid Prototypes CNC Process 3-5axis

Brake Parts Rapid Prototypes CNC Process 3-5axis

Brake Parts Rapid prototypes Material : SS /Aluminium Machining Method : CNC Machining Surface treatment : as machine Min.Order Quantity:1 Piece Lead time :7-15 around working days Payment Terms : TT, pay pal, LC,other available terms Delivery way : DHL/UPS/Air freight/Sea around 3-15days...

Send Inquiry

Product Details

Brake Parts Rapid prototypes


Material : SS /Aluminium
Machining Method :  CNC Machining
Surface treatment : as machine
Min.Order Quantity:1 Piece
Lead time :7-15 around working days
Payment Terms : TT, pay pal, LC,other available terms
Delivery way : DHL/UPS/Air freight/Sea around 3-15days arrived


163.jpg


Brake yi in the brake process due to dry friction and large friction, often appear overheating redness, at this time the staff often to the brake yb water to reduce the temperature.The brake is constantly rubbing against the heat, causing the surface temperature to rise.When its table and cherry red in colour, the local surface temperature can reach 800 ℃ above, can cause the change of organization structure and plastic deformation.Using tap water to reduce the temperature of the brake, the foot has been quenched, the surface topical hardness increases, the internal stress increases, the cold brittleness increases.Due to the effect of repeated of the tangential force at the same time, resulting in surface layer of blocky carbides and inclusions and local crack initiation, with irregular alternating shock, speed up the crack extension of the registry.CNC SLS SLA Vacumm casting tooling.


Brake yi of most organizations is in casting position, coarse grains, there are many dotted along the crack near the crack of inclusion particles, at the same time, near the crack and its grain size is very uneven, the tissue defects under the greatly reduced the strength of the material and xiang, easy cause stress concentration.The original heat treatment of the workpiece USES positive fire + medium frequency induction heating quenching and self-tempering.According to the analysis of the organization, there is a problem in the process of positive fire: the heating temperature and the time of heat preservation are not enough, and a considerable part of the cast structure is preserved.The temperature uniformity of the furnace is not uniform.Due to the large size of the brake, the heating of normal fire is carried out in the coal furnace, and the temperature uniformity is poor.In the original process, the insulation temperature is indicated (850~900), but the temperature indicated by the thermocouple is difficult, so the actual temperature is lower than the process requirement.Based on analysis of the brake yi crack is the main reason for the failure of normalizing temperature is not enough, most organizations still is in casting position, coarse grains, low intensity, workpiece and partial inclusion aggregation.In addition, the use condition of the workpiece is very bad, and there are frequent hot and cold phenomena, and the internal stress is large, which causes the workpiece to form the crack source from the inclusions and gradually expand the crack.CNC SLS SLA Vacumm casting tooling.


126.jpg


IMG_8292.JPG


IMG_8408.JPG


Three dimensional QC inspection by as below machine:


三次元.jpg


QC.jpg


Certification as :


0001.jpg



2f Prototypes is one of  most experienced prototype manufacturers .located in Shenzhen ,China .we specialized in rapid prototyping by CNC,SLA,SLS and Vacumm casting and plastic injection molding.

Advantage :

1. 15 years experience in prototype and tooling manufacture
2. Own two factories: metal  factory & plastic  factory

3. Services: CNC/SLA/SLS/Vacuum Casting/Tooling
4. Professional and various finish treatments

5. Best price and good service

6. Quote quickly and project completed effectively
7.ISO 9001:2015 &ISO/TS16949 passed


Sincerely welcome to contact us if you want inquiry .
Faye’s Email : sales2@2fprototypes.com
        Skype : dflff1984@163.com
       

Express as :

快递3.jpg


Inquiry